주요 콘텐츠로 건너뛰기

#28단계의 변경 사항

Jeff Suovanen- 에 의해 수정

편집 승인됨 완료자 Jeff Suovanen

이전
이후
변경 사항이 없습니다

단계 라인

[* icon_reminder] When reinstalling the logic board assembly:
[* black] Check the alignment of the rubber vibration dampers, and adjust them as needed.
- [* red] Verify that no cables get trapped under the board as you install it. Check each marked location carefully.
- [* orange] Feed the antenna cable bundle through the gap between the logic board and heat sink and make sure it lines up correctly.
+ [* red] Feed the antenna cable bundle through the gap between the logic board and heat sink, and make sure it lines up correctly as you lower the board into place.
+ [* orange] Verify that no cables get trapped under the board as you install it. Check each marked location carefully.

이미지 3

이전 버전

새로운 버전