주요 콘텐츠로 건너뛰기

기기를 수리하세요

수리할 권리

상점

#1단계의 변경 사항

Walter Galan- 에 의해 수정

승인 대기 중

이전
이후
변경 사항이 없습니다

단계 라인

[* black] Reconnect the iSight, inverter, left fan, and display data cables tofollowing connectors back in their respective sockets on the logic board.board:
[* red] Camera connector cable
[* orange] Inverter cable
[* green] Left fan
[* yellow] Display data cable

[* icon_note] It is unnecessary at this point to reattachicon_reminder] Do not reassemble the display to the lower casecase assembly just yet. The display can lay next to the machinelaptop.
[* black] Reconnect the iSight, inverter, left fan, and display data cables tofollowing connectors back in their respective sockets on the logic board.board:
[* red] Camera connector cable
[* orange] Inverter cable
[* green] Left fan
[* yellow] Display data cable

[* icon_note] It is unnecessary at this point to reattachicon_reminder] Do not reassemble the display to the lower casecase assembly just yet. The display can lay next to the machinelaptop.

이미지 1

이전 버전

새로운 버전

이미지 2

이전 버전

새로운 버전