주요 콘텐츠로 건너뛰기

#15단계의 변경 사항

편집자 Netmammal-

편집 승인됨 완료자 Netmammal

이전
이후
변경 사항 없음

단계 라인

[title] Cable tie down the 3-way switches
+[* icon_caution] Again, if you are going to keep the water retaining safety feature, do not drill these holes.
+[* icon_note] It might be possible to use silicon caulk to seal these penetrations, and around the switches. It is just very hard to verify the security of those seals.
[* black] Drill two small holes on each end of the where the switch will go, and then loop a cable tie through to hold the switch in position.