주요 콘텐츠로 건너뛰기

#13단계의 변경 사항

Adam O'Camb- 에 의해 수정

편집 승인됨 완료자 Adam O'Camb

이전
이후
변경 사항이 없습니다

단계 라인

-[* black] After seeing the heart of the Mate 9 we calmed down a little and go ahead with the removal of the motherboard flex and the opening of some connectors.
-[* black] A daughterboard falls in our hands and with tears in our eyes we see—the USB C port is soldered to it.
+[* black] After seeing the heart of the Mate 9 we calmed down a little and go ahead with the removal of the motherboard flex cable and the opening of some connectors.
+[* black] A daughterboard falls in our hands and with tears in our eyes we see—the USB-C port is soldered to it.
[* icon_note] Nevertheless this port is jointly responsible for the possibility to fully charge the Mate 9 in 90 minutes!