주요 콘텐츠로 건너뛰기
영어
프랑스어
5 단계
Water supply from the boiler to the K-cup needle is via a water hose through a check valve. Remove the two small screws that hold the water line to the inlet Unhook the water line from the connector above the K-cup needle. it is a simple press fit.
  • Water supply from the boiler to the K-cup needle is via a water hose through a check valve.

  • Remove the two small screws that hold the water line to the inlet

  • Unhook the water line from the connector above the K-cup needle. it is a simple press fit.

  • Next remove the tie straps. (You don't have to do this step) Just remove the other end of hose from pump. You might have to use a flat head screwdriver to lift up on end of hose while pulling up

Le conduit de l'eau de la bouilloire à la K-Cup passe par un tuyau d'eau à travers une valve anti-retour.

Retirez les deux petites vis tenant en place le conduit d'entrée d'eau.

Retirez le conduit d'eau du raccord au dessus de l'aiguille de la K-cup. Il s'agit d'un simple contact.

Puis retirez les sangles. (Cette étape n'est pas nécessaire.) Retirez juste l'autre bout du tuyau allant à la pompe. Vous pourrez avoir besoin d'un tournevis plat pour soulever le tuyau en tirant dessus.

귀하의 기여는 오픈 소스 Creative Commons 인가 하에 허가되었습니다.