주요 콘텐츠로 건너뛰기
영어
이탈리아어

11 단계 번역 중

11 단계
Place the bottom pins into the pin holes until the top of the new pin matches the shear line. Pins that are in the correct position will be flush with the shear line.  Incorrect pin placement will be above or below the shear line.  The red circle displays an incorrect placement as the pin is above the shear line. Pins that are in the correct position will be flush with the shear line.  Incorrect pin placement will be above or below the shear line.  The red circle displays an incorrect placement as the pin is above the shear line.
  • Place the bottom pins into the pin holes until the top of the new pin matches the shear line.

  • Pins that are in the correct position will be flush with the shear line. Incorrect pin placement will be above or below the shear line. The red circle displays an incorrect placement as the pin is above the shear line.

여기에 번역 삽입

여기에 번역 삽입

귀하의 기여는 오픈 소스 Creative Commons 인가 하에 허가되었습니다.