주요 콘텐츠로 건너뛰기

Turtle Beach REACT-R Vibration Motors Replacement

필요한 것

  1. Turtle Beach REACT-R Vibration Motors Replacement, Rear Case: 1 단계, 이미지 1/3 Turtle Beach REACT-R Vibration Motors Replacement, Rear Case: 1 단계, 이미지 2/3 Turtle Beach REACT-R Vibration Motors Replacement, Rear Case: 1 단계, 이미지 3/3
    • Position the controller face down so that you're viewing its underside.

    • Use a Phillips #00 screwdriver to remove the seven 9.2 mm Phillips screws that secure the rear case.

    • Use both hands to lift the backplate away from the controller.

  2. Turtle Beach REACT-R Vibration Motors Replacement, Motherboard: 2 단계, 이미지 1/3 Turtle Beach REACT-R Vibration Motors Replacement, Motherboard: 2 단계, 이미지 2/3 Turtle Beach REACT-R Vibration Motors Replacement, Motherboard: 2 단계, 이미지 3/3
    • Use a Phillips #00 to remove the four 9.2 mm screws that secure the motherboard.

    • Two of the screws are hidden under the red wires.

    • Gently lift the motherboard up and out of the chassis.

    • Be careful not to strain the vibration motor wires.

  3. Turtle Beach REACT-R Vibration Motors Replacement, Vibration Motors: 3 단계, 이미지 1/3 Turtle Beach REACT-R Vibration Motors Replacement, Vibration Motors: 3 단계, 이미지 2/3 Turtle Beach REACT-R Vibration Motors Replacement, Vibration Motors: 3 단계, 이미지 3/3
    • Be careful not to damage the vibration motors by dangling the wires.

    • Place the motherboard down on its back.

    • Grip white rumble motor connector and pull it directly out of its socket to disconnect it from the motherboard. Repeat for the other motor.

결론

To reassemble your device, follow these instructions in reverse order.

Dodi Imam

회원 가입일: 02/16/24

613 평판

안내서 6개 작성하였습니다

University of Memphis, Team 1-5, Sneed Spring 2024 University of Memphis, Team 1-5, Sneed Spring 2024 회원

UM-SNEED-S24S1G5

4 회원들

안내서 6개 작성하였습니다

댓글 0개

댓글 쓰기

조회 통계:

24 시간 전: 0

7일 전: 3

30일 전: 8

전체 시간: 52