#5단계의 변경 사항
편집자 Adam O'Camb-
편집 승인됨 완료자 Adam O'Camb
- 이전
- 이후
- 변경 사항 없음
단계 라인
[* black] Grind the location of the hole slightly until the surface feels a little rough. | |
- | [* black] Next, apply a thin coat of the rubber cement |
- | [* black] For best results wait until the rubber cement is |
+ | [* black] Next, apply a thin coat of the rubber cement around the hole. The coat of cement should be about the same size as the patch. |
+ | [* black] For best results wait until the rubber cement is dry to the touch—around three minutes. |
[* black] Finally, peel off the back of the patch, place it over the area of rubber cement with the hole centered, and then apply pressure with thumb until rubber cement is dry. |