주요 콘텐츠로 건너뛰기

#6단계의 변경 사항

편집자 Lucy Wiswall-

편집 승인됨 완료자 Lucy Wiswall

이전
이후
변경 사항 없음

단계 라인

+[* icon_note] This step begins the installation of the new gate.
+[* icon_reminder] Be sure to have the new gate and new hinges available, including nuts and bolts for each hinge, before proceeding.
[* black] Separate one of the new hinges to identify the post side and gate side.
[* black] The post side has a pin, and the gate side has a loop.
[* black] Moving forward we will call these the post hinge and the gate hinge.